A few pictures taken dring October/November.

tn floor1

The new floor (above the dumper)

 

tn floor2

The new floor from above. This floor enables the rest of the old plaster to be removed.

 

tn fire place

The old doorway to the bell tower found under the plaster

 

tn site meeting

A site meeting with the builder, architect, church wardens and Kath (the boss!)